Cafe@Tanjong Pagar


Starting a new wiring project, we assess the workload and schedule needed in detail. For the tenant, this means going thru in detail their requirements such as placement of lighting points, power outlets and aligning power usage with ducting system.

This project involves upgrading 40Amp meter to 63 Amp meter. Before 40Amp. Step by step, we will guide our customers thru the maze of submission to the ultimate goal of passing and achieving Singapore Power approval. Such challenges include preparing for load measurement, and earth leakage relay testing. Ultimately, the cafe is able to operate at 63Amp power.

HDB Registered Contractor
License Number: HB-09-5474D